Ill. TERMINAL CONSOLIDATIONS.
The terminal consolidations will be implemented in accordance with the following provisions:
A. Salt Lake City/Ogden Metro Complex. A new consolidated Salt Lake City/Ogden Metro Complex will be created to include the entire area within and
including the following trackage:
Ogden mile posts 989.0 UP east, 3.25 UP north and 780.21 SP west and to Salt Lake City mile posts 739.0 DRGW south and 781.17 UP west.
1 . All UP and SP pool, local, work train and road switcher operations within the SLC/Ogden Metro Complex shall be operated as a single carrier
operation.
2. All road crews may receive/leave their trains at any location within the boundaries of the new complex and may perform any work within
those boundaries pursuant to the controlling collective bargaining agreements.
The Carrier will designate the on/off duty points for road crews within the new
complex with the on/off duty points having appropriate facilities for inclement weather and other facilities as currently required in the collective bargaining
agreement. The on-duty points shall be the same as the off-duty points.
3. All rail lines, yards and/or sidings within the new complex will be considered as common to all crews working in, into and out of the complex. All crews will be permitted to perform all permissible road/yard moves . Interchange rules are not
applicable for intra-carrier moves within the complex.
4. In addition to the consolidated complex, all UP and SP operations within the greater Salt Lake City area and all UP and SP operations
(including the OUR&D) within the greater Ogden area shall be consolidated into two,
separate terminal operations. The existing switching limits at Ogden will now include the former SP rail line to SP Milepost 780.21. The existing UP switching limits at
Salt Lake City will now include the Roper Yard switching limits (former DRGW)
to DRGW Milepost 739.0.
B. Provo. All UP and SP operations within the greater Provo area shall be consolidated into a unified terminal operation.
C. Elko/Carlin. All UP and SP operations within the greater Elko and Carlin area shall be consolidated into a unified terminal operation at Elko. Carlin will
become a station enroute.
D. General Conditions for Terminal Operations.
1 Initial delay and final delay will be governed by the controlling collective bargaining agreement, including the Duplicate Pay and Final
Terminal Delay provisions of the 1985 and 1991 National Awards and
implementing agreements.
2. Employees will be transported to/from their trains to/from their designated on/off duty point in accordance with Article
VIll, Section 1 of the
October 31, 1985 National Agreement.
3. The current application of National Agreement provisions regarding road work and Hours of Service relief under the combined road/yard
service zone, shall continue to apply. Yard crews at any location within the Hub
may perform such
service in all directions out of their terminal.
Note: Items 1 through 3 are not intended to expand or restrict existing rules.