RULE 38. ENGINEERS SWITCHING ENROUTE WHERE YARD CREWS STATIONED.
Road engineers enroute required under instructions to do
switching where yard crews are stationed, other than setting out bad order cars
from their train and/or making a straight set out of other cars from their train
and/or making a pick up of cars into the train which are first out from a single
track, will be paid the actual time consumed with a minimum of one hour in
addition to all other time for the trip and without deduction for the time so
consumed.