III.
POOL OPERATIONS.
Pool
operations within the Portland Hub zone 1 shall be run as follows:
A.
Current UP 1st and 2nd District pool home and away from
home terminals are not modified by this agreement.
B.
SP pool operations shall be modified to add pool freight
service between Portland (home terminal) and Oakridge (away from
home terminal) and sufficient engineers shall be relocated to
protect this service.
C.
Oakridge-Klamath Falls and Dunsmuir-Oakridge service shall
also be instituted and current Eugene-Klamath Falls service shall be
discontinued. Recognizing
that some employees may commute to Oakridge from Eugene, if due to
inclement weather at Oakridge after their return from Klamath Falls,
the Carrier will assist with lodging at Oakridge if available. If
requested an engineer may receive a two hour call for Oakridge
service.
NOTE
:
The Carrier shall give notice
for the implementation of service
in (B) and (C) above if not given in the notice to implement this
Zone 1 agreement. The
notice shall include the number of initial positions that will be
changed. Applications
shall be accepted for 15 days for the new positions.
Engineers shall be notified of their assignment either by
application or force in the seven days following close of
applications. Assignments
shall be phased in beginning 30 days after the application closing
date. CMS will work
with the local chairman with this process.
If additional positions are established within the first
year, over and above the original number, the same process will be
used.
D.
When
the Portland-Oakridge and Oakridge-Klamath Falls service is started,
additional traffic may result in both the transfer of positions
and an increase in new positions.
Both new and transferred will be covered under the provisions
of this agreement for a two year period.
New positions at Portland will be determined by using the
average number of pool turns in the first quarter 1998 as the
baseline number. One
must remember that employees will be going to assignments in
Dunsmuir, Oakridge and Portland.
E.
SP Engineers forced to Dunsmuir will be permitted to make
application back to their original prior rights Zone.
The application must be on file within sixty (60) days of
being forced and will be honored when vacancies of a minimum of
thirty (30) days exist in the original SP prior right area of Zone 1
and there are no engineers their senior on reserve boards or demoted
in that Zone. If an
engineer is recalled and declines the recall, then his/her
application will be pulled and not reentered. (See relocation
section on restrictions if relocation allowances are requested).
becomes
vacant. If the
engineer returning to the original zone works for ninety (90) days
without being demoted then the
forced zone rights will be relinquished and the original zone
rights reinstated.
F. Any pool freight, local, work train, or road switcher service may be established pursuant to the controlling CBA to operate from any point to any other point within the new Hub with the on duty point within Zone 1.